Materials

How much concrete?

Slabs, footings and post holes. Get the cubic metres, the bag count and what to order from the truck.

1. Slab or footing

m
m
mm

2. Post holes

mm
mm

3. Extras

%
m³
You need
0
cubic metres, waste included
Slab or footing
0
Post holes
0
20 kg bags
0
Truck order, rounded up
0

The starting figures are typical New Zealand numbers as at October 2026. Change any of them to match your business. A guide only. Check bag yields and mixes with the supplier, and follow the consented plans and NZS 3604 for anything structural.

Handy next

Keep in touch.

Leave your email and we may let you know about new tools now and then. No spam, and we never sell your address.